For this project the client wanted to create a stunning effect, without
creating any maintenance problems. Fibre optics had been trialled but
the poor light outputs simply did not create the effect required.
Trials of Elektor–FLEX were carried out and the system was chosen as it
created brilliantly the desired effects. As access for maintenance is a
problem, i.e. Scaffolding required which would result in the bridge
being taken out of commission it was essential that the chosen product
was virtually maintenance free. The result was that Elektor–FLEX created
the exact effects the client wanted, in a way that would require
virtually no on going maintenance.
Neon Lighting had originally been considered, but Neon Lighting is
manufactured from Glass and operates at typically 30,000 volts. The
Lighting on the bridge is in a location where the public could easily
touch it, so the scenario of Glass Tubes and High voltage on a Bridge
over water, speaks for it self. In addition Neon requires each tube to
factory manufactured to the exact shape required. Elektor–FLEX comes on
a roll, can be cut to length and shaped on site. It operates at 24v DC
and is made of soft polymers, so even if you were to throw a brick at
it, it would simply bounce off.
The installation comprises of over 70 metres of Ultra Bright Blue
Elektor flex incorporating nearly 7000 LED's with a design life of over
100,000 hours.
The installation was designed and specified by Designers, C Spencer Ltd
of Hull, working with Chamaeleon's Technical Sales Consultant, Adam
Knight and was installed with ease by the installation contractor,
Sercon Controls Ltd of Huddersfield.
The finished project has created a stunning feature in Torquay, the
combination of product selection, good design and good installation have
culminated in a project that all concerned can be proud to be associated
with.